Linear scheduling from your Primavera P6 programme

Keep scheduling in P6. Give each activity a chainage and draw the linear schedule from the same data, every update.

Linear scheduling

Where the work is, as well as when

Linear scheduling, also called the linear scheduling method or location-based scheduling, plans repetitive work by where it happens along a route as well as when. It belongs to jobs where crews move in a line: railways, highways, pipelines, tunnels and transmission lines. The output is a time location chart with chainage across the page and time running down, where each crew is a sloping line and the slope is its rate of progress.

DRL-DEMO · Read from an XERChainage across · time down
The TCC window with a fictional rail project read from an XER: the Work Types list on the left with the Work Type field above it, the chart in the middle split into five areas from WEST to EAST with chainage across and time down, and a sheet switch in the toolbar.
TCC on WindowsFictional project

Free download · Version 1.0

Free for everyone

Every feature, with no account and no activation code. Printed sheets carry a small “Made with Time Chainage Chart” line.

Get it from Microsoft Store

Installs in one click and the Store keeps it up to date.

Download the installer (.exe)

Version 1.0 · 19 MB
If Windows shows “Windows protected your PC”, click More info › Run anyway.

System
Windows 10 or 11, 64-bit
Also needs
Edge WebView2 and .NET Framework 4.6.2 or later. Most Windows PCs have both.
Reads
P6 Professional database, or an XER export
Internet
Not needed. The installer version looks for updates once a day; you can turn that off.